Anaerobic Incubator LAI-3T

Features

★Microprocessor controller ,large color touch screen,accurately control the temperature and gas in incubator,easy operation.

★ The system adopts Siemens PLC as the core controller,complementary with high precision temperature sensors, oxygen sensor, temperature control module and analog module to ensure high accuracy, good stability and high security, real-time monitoring of process data.

★ UV Sterilizer,effectively prevent bacterial contamination.

★ Switch control for solenoid valve, it can accurately adjust the flow and input any necessary gas.

★ Stainless steel cultivation and operation room,transparent impact-resistant glass front window for easy observation. Latex gloves are comfortable and reliable,easy to use.

★ Operation room is equipped with deoxidization catalyst.

★ The incubator is designed with a double widen door,it can put more petri dishes.

★ Imported oxygen sensors can observe oxygen concentration in the operating room at any time.

★ Equipped with leakage protection.

★ The operating room is equipped with special inoculating rod sterilizer and wax melting disinfection device.

★ With USB interface, can store 6 months of data.

 

Specifications

Model

LAI-3T

Time for creating anaerobic state in sample chamber

<5 minutes

Time for creating anaerobic state in operation chamber

<1 hr

Anaerobic environment maintenance time

>12 hrs.(when no supply of mixed gas)

Temperature Range

RT+3~60℃

Temperature Stability

<±0.3℃

Temperature Uniformity

<±1 ℃

Display Resolution

0.1℃

Timing Range

1~9999min

Power Rating

600W

Power Supply

AC 220V,50HZ

Net/Gross Weight(kg)

240/320

Interior Chamber Size(W×D×H)cm

30×19×29

Operation Chamber Size (W×D×H)cm

82×66×67

Exterior Size (W×D×H)cm

126×73×138

Package Size(W×D×H)cm

139×92×156

 

 


Quality Control and After-Sales Service

Please don't worry, our products are superior in quality, If you have any problems, please feel free to let us know, we are glad to support as below:
▶ Good quality firstly to avoid any defective products , Protective packaging to avoid destroy during delivery ; ( CE and ISO Certified )
▶ Pure english operation manuals ; installation & operation vedio will be provided to you as guidance ; No delay fast delivery service
   ( usually 7~15 working day after payment )
   We could provide Online instruction ;  Real-time support by vedio-call or voice-chat . 
▶ During warranty time, we can send product accessories when you need for free; Technical guidance is free and ready forever .
▶ Your technicians can come to our factory for training , Drawell engineers can go your place for local support ( installation , training , debugging, maintenance );
▶ Products can be customized according to your requirements; OEM serivce availabe with customers’ brand.
* Generaly the machine can use 5~10 years for average even longer if you use properly.
 

Exhibition:

Lab Africa in South Africa;  Arablab in Dubai;  Analytica Latin America in Brazil,  PITTCON in USA
Analytica in Russia;  Analytica in Germany

 

 

Customers :

From more than 80 countries , partners and distributors usually come to visit Drawell from all over the world.

 

 

Service:

When customers need, we will provide online service all the time except sleep, no matter working time or resting time, no matter working days or holiday.
You can contact us through :  Emails, Skypes, Whatsapp, Wechat, QQ, Facebook, Linkedin and etc.  Anytime.
Our engineers can go to any countries to do local help.

 


FAQ

Q1. Are you factory or trading company ?

We are a factory.

Q2.  What’s the MOQ ?

1. Normally,MOQ is 1 piece. But if the items are in stock,there is no MOQ. 

The quantity is according to the clients requires.  

2.If there is no stock,the general MOQ are in big difference due to the different products. But the quantity still can be negotiated .

Q3. What is your principle for the samples ?

We do not provide free sample.

Q4.Which payment can be acceptable ? 

We could accept the payment by L/C, T/T, Paypal , Western Union,etc.

Q5. How about your delivery time?

Generally, it will take 7 to 15 working days after receiving your advance payment. Depend on the quantity.

Q6. Certificate & Quality.

CE and ISO certified for most products. Good quality firstly to avoid any defective products , Protective packaging to avoid destroy during delivery.

Q7.Language.

Pure English operation panel , display , manuals ; installation & operation videos will be provided to you as a guidance

Q8.Service

We could provide Online instruction ; Real-time support by video-call or voice-chat , During warranty time, we can send product accessories when you need for free; Technical guidance is free and ready forever .

Q9.Training

Your technicians can come to our factory for training , Drawell engineers can go your place for local support( installation , training , debugging, maintenance ); Products can be customized according to your requirements; OEM service is available with customers’ brand.

CONTACT US

  • weIcome to contact us, we wiIl do our best to help you !